Articles on: Indexation
This article is also available in:

Change a cost with a variation

Change a cost with a variation


Change a cost with a variation


🎯 GOAL: reproduce a change set by the lease without an index (+2% a year, +€5,000 in the 3rd year, a stepped rent) so that Leasup calculates each amount on the right date.




πŸ‘‰ Where

Lease page β€Ί Finance β€Ί Fixed rents & charges β€Ί cost card β€Ί Consult β€Ί Rent review mechanism β€Ί Adjustment β€Ί Variation

πŸ‘€ Who

Every profile except Observer.

βœ… Prerequisites

The rent or the charge created. The change clause of the lease or the amendment.

⏱️ In practice

When the lease or the amendment is entered.


In this article



1- Variation or indexation?


The lease provides for…

In Leasup

a change according to an index (ILC, ILAT, ICC…)

an indexation: see Index a rent or a charge

a fixed percentage ("+2% a year")

a variation in %

a fixed amount ("+€5,000 on 1 January 2028")

a variation as a flat amount

an indexation, then a one-off step

an indexation and a variation on the same cost, on different dates


A cost can carry both indexations and variations: the Adjustment tab shows them in two blocks, Indexation and Variation.


2- Adding a variation


Adding a variation of +2% a year


  1. On the cost card, click Consult.
  2. In the Rent review mechanism, Adjustment tab, click Create a new variation.
  3. Frequency: Recurring (every period) or Unique (once only).
  4. Periodicity (recurring variation): Annual, Triennial, Quarterly or Monthly.
  5. Adjustment date and End date.
  6. Variation type and Increase value (see section 4).
  7. Comment: the clause and the page of the lease. Then Save.


3- The fields of the form


Field

Options

Good to know

Frequency

Unique, Recurring

Unique: a single change, on one date.

Periodicity

Triennial, Annual, Quarterly, Monthly

Recurring variation only.

Adjustment date

Cost start date (default), 1st day of the period, Specific date

As for an indexation.

1st adjustment date

calculated

Filled in by Leasup; you fill it in yourself with Specific date.

End date

No end date, Cost end date, Specific end date

How long the variation applies.

Variation type

% on fixed amount, % on increased amount (default), Flat amount

See section 4.

Increase value

β€”

A percentage or an amount, depending on the type. A negative value means a decrease.


4- The three types of variation


Example: a starting amount of €200, with a variation of 20% or of €17 per period.


Type

What Leasup applies

Period 1

Period 2

Period 3

% on increased amount

the % to the amount of the previous period, already increased (compound growth)

€240

€288

€345.60

% on fixed amount

the % to the starting amount, at each period (linear growth)

€240

€280

€320

Flat amount

the amount added at each period

€217

€234

€251


⭐ LEASUP TIP: read the wording of the lease again. "The rent will be increased by 2% each year" generally refers to the current rent (% on increased amount). "An increase of 2% of the initial rent" refers to the starting amount (% on fixed amount).


πŸ’‘ TIP: a Recurring variation of 0% leaves the amount unchanged. It is used to open the Advanced options of a charge that does not change, in order to put a cap on it: see Plafonner des charges (in French).


5- Limits and points to watch


  • A stepped rent that first decreases, then rises back to the lease rent, is better set up with reductions: see Grant a rent-free period or a rent reduction.
  • A variation applies to a fixed cost: not to a variable rent.
  • Two revisions of the same cost, indexation or variation, cannot fall on the same date: schedule them on different dates, as in the case study.
  • Check the result in the Evolution panel (history icon on the card).
  • All amounts are excluding VAT.


6- Case study: a stepped rent


An amendment sets a rent of €300,000 excl. VAT from 1 January 2027, increased by 2% a year on the current rent, with a step of €15,000 on 1 July 2029, after works by the landlord.


Step

What you do

What Leasup shows

1

Create a new variation: Recurring, Annual, Cost start date, Cost end date, % on increased amount, 2 β€Ί Save

€306,000 in 2028, €312,120 in 2029.

2

Create a new variation: Unique, Specific date, 1 July 2029, Flat amount, 15,000, comment "Amendment 2026, art. 3" β€Ί Save

€327,120 from 1 July 2029. The step falls on a different date from the annual variation on 1 January.

3

Evolution panel β€Ί Adjustment

Each date, its calculation and its adjusted amount.



Going further

Updated on: 20/11/2026

Was this article helpful?

Share your feedback

Cancel

Thank you!